{"id":5772,"date":"2021-08-06T10:14:09","date_gmt":"2021-08-06T10:14:09","guid":{"rendered":"http:\/\/3.236.132.51\/?p=5772"},"modified":"2026-04-12T11:23:28","modified_gmt":"2026-04-12T11:23:28","slug":"building-a-brighter-future","status":"publish","type":"post","link":"https:\/\/www.usviodr.com\/es\/building-a-brighter-future\/","title":{"rendered":"Building a Brighter Future"},"content":{"rendered":"<div class=\"kvgmc6g5 cxmmr5t8 oygrvhab hcukyx3x c1et5uql ii04i59q\">\n<p dir=\"auto\">August 6, 2021<\/p>\n<h1 dir=\"auto\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-5773 aligncenter\" src=\"https:\/\/www.usviodr.com\/wp-content\/uploads\/2021\/08\/Contant-1-7.30.jpg\" alt=\"\" width=\"566\" height=\"424\" \/><\/h1>\n<h1 dir=\"auto\" style=\"text-align: center;\">Building a Brighter Future<\/h1>\n<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\"><\/div>\n<div class=\"o9v6fnle cxmmr5t8 oygrvhab hcukyx3x c1et5uql ii04i59q\" style=\"text-align: center;\">\n<h3 dir=\"auto\">Last week Haugland Virgin Islands line workers continued the installation of composite power poles in Upper Contant on St. Thomas. The VI Water and Power Authority is leading operations to install 2,333 composite poles in some of the most remote areas on the island.<\/h3>\n<\/div>\n<h3 dir=\"auto\"><\/h3>\n<p>&nbsp;<\/p>\n<div class=\"o9v6fnle cxmmr5t8 oygrvhab hcukyx3x c1et5uql ii04i59q\">\n<h3 dir=\"auto\" style=\"text-align: center;\">The project is about 45% complete, and over 1,000 poles have been installed. FEMA has obligated more than $300 million through its Public Assistance Program to support electrical distribution permanent repairs throughout the island.<\/h3>\n<p>&nbsp;<\/p>\n<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-5774 aligncenter\" src=\"https:\/\/www.usviodr.com\/wp-content\/uploads\/2021\/08\/Contant-2-7.30.jpg\" alt=\"\" width=\"571\" height=\"365\" \/><\/div>\n","protected":false},"excerpt":{"rendered":"<p>August 6, 2021 Building a Brighter Future Last week Haugland Virgin Islands line workers continued the installation of composite power poles in Upper Contant on St. Thomas. The VI Water and Power Authority is leading operations to install 2,333 composite poles in some of the most remote areas on the island. &nbsp; The project is [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":18033,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"project_id":"","notification":"","due_date":"","status":"","show_rebuild":"","footnotes":""},"categories":[29,154],"tags":[],"class_list":["post-5772","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-viodr-news"],"_links":{"self":[{"href":"https:\/\/www.usviodr.com\/es\/wp-json\/wp\/v2\/posts\/5772","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.usviodr.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.usviodr.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.usviodr.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.usviodr.com\/es\/wp-json\/wp\/v2\/comments?post=5772"}],"version-history":[{"count":1,"href":"https:\/\/www.usviodr.com\/es\/wp-json\/wp\/v2\/posts\/5772\/revisions"}],"predecessor-version":[{"id":18832,"href":"https:\/\/www.usviodr.com\/es\/wp-json\/wp\/v2\/posts\/5772\/revisions\/18832"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.usviodr.com\/es\/wp-json\/wp\/v2\/media\/18033"}],"wp:attachment":[{"href":"https:\/\/www.usviodr.com\/es\/wp-json\/wp\/v2\/media?parent=5772"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.usviodr.com\/es\/wp-json\/wp\/v2\/categories?post=5772"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.usviodr.com\/es\/wp-json\/wp\/v2\/tags?post=5772"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}