{"id":11792,"date":"2025-09-12T13:20:05","date_gmt":"2025-09-12T13:20:05","guid":{"rendered":"https:\/\/www.usviodr.com\/?p=11792"},"modified":"2026-04-12T13:55:16","modified_gmt":"2026-04-12T13:55:16","slug":"wapa-announces-road-closures-for-hannahs-rest-electrical-undergrounding-project","status":"publish","type":"post","link":"https:\/\/www.usviodr.com\/fr\/wapa-announces-road-closures-for-hannahs-rest-electrical-undergrounding-project\/","title":{"rendered":"WAPA Announces Road Closures for Hannah\u2019s Rest Electrical Undergrounding Project"},"content":{"rendered":"<p style=\"text-align: left\">September 12, 2025<\/p>\n<p style=\"text-align: center\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-11793\" src=\"https:\/\/www.usviodr.com\/wp-content\/uploads\/2025\/09\/Hannahs-Rest-Road-Closure-9.12.25-250x92.png\" alt=\"\" width=\"406\" height=\"149\" \/><\/p>\n<h1 style=\"text-align: center\">WAPA Announces Road Closures for Hannah\u2019s Rest Electrical Undergrounding Project<\/h1>\n<p>The Virgin Islands Water and Power Authority (\u201cWAPA\u201d or \u201cthe Authority\u201d) is advising motorists of upcoming roadwork on Centerline Road in the Hannah\u2019s Rest area. The work is part of the ongoing Hannah\u2019s Rest Phase 1 Electrical Undergrounding Project.<\/p>\n<p>From Monday, September 15, 2025, through Monday, October 20, 2025, traffic in both directions will be affected on sections of the roadway between the Walter I.M. Hodge Pavilion and the western Caribbean Centers for Boys and Girls.<\/p>\n<p>These temporary closures will allow WAPA\u2019s contractor, J. Benton Construction, to continue installing underground electrical infrastructure. This project is critical to improving the reliability of service and strengthening the resilience of St. Croix\u2019s electrical grid against storms.<\/p>\n<p>Motorists are urged to exercise caution, follow posted detour signs, and comply with traffic cones and flaggers to maintain a safe environment for workers and fellow travelers.<\/p>\n<p>WAPA thanks the community for its patience, cooperation, and support as this essential infrastructure project progresses.<\/p>\n<p style=\"text-align: left\">\nThe Virgin Islands Water and Power Authority Communication\u2019s department is committed to reaching, informing, and connecting with the youngest members of the community to the eldest, through meaningful, transparent and effective communication.<\/p>\n<p style=\"text-align: center\">\n###<\/p>\n","protected":false},"excerpt":{"rendered":"<p>September 12, 2025 WAPA Announces Road Closures for Hannah\u2019s Rest Electrical Undergrounding Project The Virgin Islands Water and Power Authority (\u201cWAPA\u201d or \u201cthe Authority\u201d) is advising motorists of upcoming roadwork on Centerline Road in the Hannah\u2019s Rest area. The work is part of the ongoing Hannah\u2019s Rest Phase 1 Electrical Undergrounding Project. From Monday, September [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":17900,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"project_id":"","notification":"","due_date":"","status":"","show_rebuild":"","footnotes":""},"categories":[29,156],"tags":[],"class_list":["post-11792","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-press-releases"],"_links":{"self":[{"href":"https:\/\/www.usviodr.com\/fr\/wp-json\/wp\/v2\/posts\/11792","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.usviodr.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.usviodr.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.usviodr.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.usviodr.com\/fr\/wp-json\/wp\/v2\/comments?post=11792"}],"version-history":[{"count":1,"href":"https:\/\/www.usviodr.com\/fr\/wp-json\/wp\/v2\/posts\/11792\/revisions"}],"predecessor-version":[{"id":19086,"href":"https:\/\/www.usviodr.com\/fr\/wp-json\/wp\/v2\/posts\/11792\/revisions\/19086"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.usviodr.com\/fr\/wp-json\/wp\/v2\/media\/17900"}],"wp:attachment":[{"href":"https:\/\/www.usviodr.com\/fr\/wp-json\/wp\/v2\/media?parent=11792"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.usviodr.com\/fr\/wp-json\/wp\/v2\/categories?post=11792"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.usviodr.com\/fr\/wp-json\/wp\/v2\/tags?post=11792"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}